David Scott, UK National Grid, United Kingdom
在英格兰和威尔士,管理高压输电网这一职责由英国国家电网承担。准确计算电缆的额定值(正常温度区间内电缆所能承受的最大负载)是一项重大任务,这是解决拥挤地带施工建设、电缆密集、环境影响等问题,以保证用电安全、可靠以及电价实惠的根本。借助多物理场仿真,英国国家电网能够模拟土壤干燥度、土壤开裂程度及其他电缆的邻近效应对电缆性能的影响,从而以最少的成本提升电缆容量。
Loading PDF...
Suggested Stories
Driving EV Development with a Twin-Battery Approach
IAV developed an approach for combining ...
Peeling Away Memory Chips
As memory chips become smaller and smaller, ...
Simulation-Led Strategy for Corrosion Prevention
Corrosion is a widespread concern costing ...
The Sight of Sound: Revealing the Effects of Enclosure Design on Loudspeaker Performance
L-Acoustics uses acoustics simulation to ...
