SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

能源

David Scott, UK National Grid, United Kingdom

在英格兰和威尔士,管理高压输电网这一职责由英国国家电网承担。准确计算电缆的额定值(正常温度区间内电缆所能承受的最大负载)是一项重大任务,这是解决拥挤地带施工建设、电缆密集、环境影响等问题,以保证用电安全、可靠以及电价实惠的根本。借助多物理场仿真,英国国家电网能够模拟土壤干燥度、土壤开裂程度及其他电缆的邻近效应对电缆性能的影响,从而以最少的成本提升电缆容量。

  •  /
1
Loading PDF...

Suggested Stories

Defying Convention to ...

Defying Convention to Achieve Faster Signal and Simulation Speeds

As the demand grows for faster electronic ...

Optimizing Wireless Test ...

Optimizing Wireless Test Systems and Antennas for High-Speed Communication

To design reverberation systems for ...

Improving Overhead ...

Improving Overhead Equipment Devices for a New Era of Railway Transportation

Using structural modeling and optimization, ...

Scattering of ...

Scattering of Electromagnetic Waves by Particles

When electromagnetic waves propagate through ...